This network was built during 2018 as part of the partial construction of the constituent networks of the Albanian Geodetic Reference Framework (KRGJSH), with European and combined standards, and during 2023, Order II was densified with 300 new points. GNSS surveys at Order I and II points were carried out using the static method with a minimum observation duration of 60 min for each point, with the instrument fixed in a stable manner throughout the duration of the measurements. The processing of static measurements for Order I, II points was carried out respecting the requirements and tolerances set in the technical specifications with an accuracy of 1-2 cm in plan and in height.