The implementation of the gravimetric network of orders I, II and III was carried out during the period August-October 2018 and June-November 2024 for 634 third-order points within the framework of the partial construction of the networks as part of the Albanian Geodetic Reference Framework (KRGJSH), with European standards and combined between them. This project was carried out under the coordination of ASIG in cooperation with Albanian specialists in the field of geophysics and geodesy, the Department of Geophysics and the University of Thessaloniki. During the implementation of field measurements, the following criteria were taken into account: • The standard deviation in determining the value of the gravitational acceleration of the force of gravity at the points of the first-order gravimetric network did not exceed the value of 10 µGal (Order I), ≤ 20 µGal (Order II) and ≤ 30 µGal (Order III). • Measurements at the Gravimetric points of Order I and II were carried out with two instruments Gravimetra Sintrex-CG5, at least 2 measurements (round trip) in the time frame of one day. For Order III, they were carried out with a relative gravimeter but with the same parameters of Order I and II. • For the relative gravimetric measurements of Order I and II, the profile method was used, where the measurement of the gravimetric points of the first order started and ended at the absolute gravimetric points of Order 0 (AGP 01; AGP 02; AGP 03). The Second Order measurements started and ended at the First Order points, in a few cases absolute points were also used, while the Third Order started and ended at the points of Order I and Order II). • The coordinates of the points were determined with GNSS measurements, according to the technical specifications on these measurements. GNSS surveys at Order I and II points were conducted using the static method with a minimum survey duration of 60 min for each point, while for Order III, using the RTK method, 2 min.